Skip to content

Quick Turnaround on Frame Turbine Thermocouples and Cable Assemblies

Monday, September 18, 2023
Categories : Products

Are you in need of Frame turbine components but don’t have the time to wait on a slow supplier? AMETEK Power Instruments can deliver most of our OEM qualified components in SIX weeks or less. We understand how important it is to keep your power plant running and our quick turnaround on thermocouples and cable assemblies ensures your Frame turbine can keep working at maximum performance.

We manufacture superior products that exceed the need of the OEM and we’ve been a qualified supplier for Frame 5 through Frame 9 Turbines for more than 30 years. Our experience has allowed us to stay on top of the recent instabilities in the supply chain for raw materials that have caused delays and delivery issues for many manufacturers. By staying ahead of the supply issue, we have been able to maintain our normal lead times of six weeks or less on most components through these challenging and unstable times within the supply chain. This means you can get our 8PT25 Spring/Non-Spring-Loaded Thermocouples, 8PC33 Thermocouple Cables, exhaust gas and wheel space thermocouples and much more delivered to your door faster than many other OEM certified suppliers!

Knowing how important it is to keep your turbine running at any given time has positioned our team to respond, react and execute. We take pride in providing fast response times, excellent customer service, OEM qualified parts and superior quality for Frame turbine users all over the world.

What are you waiting for? Not parts if you contact us and stop waiting on a slow supplier! Visit our product pages to learn more about OEM qualified thermocouples and cable assemblies.

Archives

Skip Navigation Links.
Collapse 2024(11)2024(11)
Expand 2023(12)2023(12)
Expand 2022(12)2022(12)
Expand 2021(9)2021(9)